Dbs has recently manufactured and installed a new concept build for Trotters within Harrods 4th floor childrenswear department. Our build has laser cut slot system on the rear face of wall structure, so no unsightly forward facing slots !
Our brief was to attend site and survey the whole concessional area, to ensure we had a good understanding of its location and of all existing fixtures. We then issued full cad set out drawings for approvals of both client and ?Harrods prior to build.
the attached photographs show workshop manufacture and trial assembly frame and fittings to guarantee an easy site install
In the period of manufacturing all components, we submitted all method statements and risk assessments, also giving full details of how we would control the risk of covid 19 and observing all Harrods implement practices.
Our supplied metalwork was nylon powder coated giving excellent ware properties and longevity.
Installation was performed over one night and our team remained on site for a client to Harrods handover.
This project had a 3 week turnaround period.